PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical conduit at the 3rd Floor Facing West (600x800).jpg Fireproofing the 2nd Floor Facing West (800x600).jpg Installed copper pipes above the cealing at the 1st Floor Facing North (800x600).jpg Installing copper piping at the 1st Floor Facing West (800x600).jpg Installing the main Sprinkler pipe at the 1st Floor Facing West (800x600).jpg Started installing top metal track at the 4th Floor Facing East (800x600).jpg Unloaded duct work for the 2nd Floor Facing South (800x600).jpg Welded clips along the column at the 2nd floor (North Elevation) (1) (600x800).jpg Welded clips along the column at the 2nd floor (North Elevation) (2) (600x800).jpg
Previous pageNext page Installing the main Sprinkler pipe at the 1st Floor Facing West (800x600)
Installing the main Sprinkler pipe at the 1st Floor Facing West (800x600)